Jump to content

Recommended Posts

I am probably very late to this, but I see that the redevelopment of peckham rye station has been approved: http://planbuild.southwark.gov.uk:8190/online-applications/applicationDetails.do?activeTab=details&keyVal=_STHWR_DCAPR_9563201


Maybe I can't read the drawings correctly, but I couldn't see plans to make the station handicap accessible. That can't be correct, is it?

LD929 Wrote:

-------------------------------------------------------

> I am probably very late to this, but I see that

> the redevelopment of peckham rye station has been

> approved:

> http://planbuild.southwark.gov.uk:8190/online-appl

> ications/applicationDetails.do?activeTab=details&k

> eyVal=_STHWR_DCAPR_9563201

>

> Maybe I can't read the drawings correctly, but I

> couldn't see plans to make the station handicap

> accessible. That can't be correct, is it?


Shouldn't that be 'disabled access' as noted in the Equality Act 2010 (formerly the Disability Discrimination Act 1995).

LD929 Wrote:

-------------------------------------------------------

> I am probably very late to this, but I see that

> the redevelopment of peckham rye station has been

> approved. Maybe I can't read the drawings correctly, but I

> couldn't see plans to make the station handicap

> accessible. That can't be correct, is it?


You're right. It's not there. This is the result of one of many sleights of hand from the Council to recover from their disastrous approach to the station site planning during 2012/13 which led to the notorious Weston Williamson plan to demolish everything and build 5-7 storey housing blocks and clear out all the businesses alongside and behind the station at once: http://www.peckhamvision.org/wiki/Peckham_Rye_Station_Gateway/Jan-Sep_2014#Network_Rail_plans_reveal_total_demolition_18th_January_2014

They then said they would 'codesign' it with local people (just before the 2014 local elections). But then two years of obfuscation since then has resulted in a plan for the new square being approved with no relationship to all the other integral parts of it - this includes step free access for the station, and design of the public realm in the immediately adjoining streets! All objections that the details of the related parts of the station site had to be part of a whole have been brushed aside by the Council to give planning permission. All the other parts are probably being dealt with behind the scenes but in spite of the promise to 'codesign' the station site, no one knows anything. How well they fit together or when remains to be seen. This is how the Planning system operates now unfortunately.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • The top front tooth has popped out.  Attempted to fix myself with repair kit bought from Boots, unfortunately it didn’t last long.  Tooth has popped out again.  Unable to get to dentist as housebound but family member can drop off.  I tried dental practice I found online, which is near Goose Green, but the number is disconnected.   The new dental practice in FH (where Barclays used to be) said it’s not something they do.  Seen a mobile dental practice where a technician comes to your home and does the repair but I’m worried about the cost. Any suggestions please? Thank you 
    • So its OK for Starmer to earn £74K/annum by renting out a property, cat calling the kettle black....... Their gravy train trundles on. When the Southport story that involves Starmer finally comes out, he's going to be gone, plus that and the local elections in May 2025 when Liebour will get a drumming. Even his own MP's have had enough of the mess they've made of things in the first three months of being in power. They had fourteen years to plan for this, what a mess they've created so quickly, couldn't plan there way out of a paper bag.   Suggest you do the sums, the minimum wage won't  be so minimum when it is introduced, that and the increase in employers national insurance contributions is why so many employers are talking about reducing their cohort of employees and closing shops and businesses.  Businesses don't run at a loss and when they do they close, its the only option for them, you can only absorb a loss for so long before brining the shutters down and closing the doors. Some people are so blinkered they think the sun shines out of the three stooges, you need to wake up soon. Because wait till there are food shortages, no bread or fresh vegetables, nor meat in the shops, bare shelves in the supermarkets because the farmers will make it happen, plus prices spiralling out of control as a result of a supply and demand market. Every ones going to get on the gravy train and put their prices up, It happened before during lockdown, nothing to stop it happening again. You don't shoot the hand that feeds you. Then you'll see people getting angry and an uprising start to happen.  Hungry people become angry people very quickly. 
    • Eh? Straight ahead of what?  If you turn left at Goose Green, as you also posted above, you end up at the library. Then the Grove. Then, unless you turn right at the South Circular, you end up at Forest Hill!
    • yes I’ve spotted this too — it’s near me and I’m very intrigued to see what it’ll be 👀👀👀👀      
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...