Jump to content

Recommended Posts

London Bridge (Southern) station is closed for nine days from Saturday 23rd to Sunday 31st August 2014. Trains from East Dulwich will start and finish at South Bermondsey during this period. This will be very disruptive to people travelling to the City and Canary Wharf. Suggest anybody not on holiday that week goes to www.tfl.gov.uk and replans their journey.


The number 40 bus goes direct from East Dulwich to London Bridge. Also worth getting the East London Line from Denmark Hill or Brockley to Canada Water for Canary Wharf (there'll be extra services from Brockley). The 42 bus from Sunray Avenue is also a good link to City Hall, Tower Hill, Aldgate and Liverpool Street.

Thanks. At least as significant seems to be that during the evening peak - from 1600-1900 - the number of trains from London Bridge to Peckham Rye / East Dulwich has been reduced to 4 per hour from 6 per hour. The remaining ones are not spaced evenly either, with 20 minute gaps between some trains.


CANCELLED TRAINS ?FROM LONDON BRIDGE

16:20 London Bridge to Selhurst

16:50 London Bridge to Selhurst


TERMINATING/STARTING SHORT TRAINS FROM LONDON BRIDGE

08:50 London Bridge to Beckenham Junction will start from South Bermondsey at 08:54

17:20 London Bridge to Wimbledon will start from South Bermondsey at 17:24

17:50 London Bridge to Wimbledon will start from South Bermondsey at 17:54

18:20 London Bridge to Wimbledon will start from South Bermondsey at 18:24

18:50 London Bridge to Epsom will start from South Bermondsey at 18:54

worldwiser Wrote:

-------------------------------------------------------

> Does anyone know whether post Thameslink programme

> the intention is to have more tracks into LB than

> there were until now? Or just the same as before?



More through platforms, less terminating platforms.

rahrahrah Wrote:

-------------------------------------------------------

> Looks like there is going to be a loss of two

> morning trains (7:31 and 8:15) post 1st September

> too:

>

> http://www.southernrailway.com/download/31749.9/27

> -june-september/


Well spotted, thanks for sharing the link. However, from reading the document it appears slightly differently.


7:31 is the time of the train departing West Croydon. This is the 08:00 service from East Dulwich which will still run but then terminate at South Bermondsey.

8:15 is the time of the train departing Beckenham Junction, which is the 08:40 service from East Dulwich. This also will terminate at South Bermondsey.


As djaq2000 pointed out, there's also the loss of the 17:20, 17:50, 18:20 and 18:50 from London Bridge (which will start at South Bermondsey). However, the other services out of London Bridge have been slightly retimed in order to spread the load.


Not so much impact if you are connecting to other services before LBG, but if your commute is from Dulwich to London Bridge, then that's a sizeable impact. The key peak services now will be:


East Dulwich to London Bridge (curtailed services marked as '-'):

07:09

07:20

07:30

07:40

07:50

-

08:10

08:20

08:30

-

08:51


London Bridge to East Dulwich:

17:10

17:25

17:40

17:57

18:10

18:30

18:40

No you don't get charged extra as Clapham High Street / Clapham North is classed as an Out of Station Interchange (OSI). In fact going this route is likely to be cheaper than going by London Bridge National Rail. So Denmark Hill - Moorgate for example is on Oyster PAYG ?4.10 peak and ?3.50 off peak going by National Rail at London Bridge but go via Clapham High Street / Clapham North it is ?2.80 peak and ?2.20 off peak. So if you currently do East Dulwich to somewhere in the City might be worth going to Denmark Hill instead

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • Thanks 🙏 I appreciate your reply 
    • Another bite for JAGS ( James Allen Girls school) classes are excellent too. There is also Dulwich boys but less light and airy )might be better nor as haven’t been for a while) 
    • Photos. Every single piece of litter in that photo (if you enlarge it you can see lots more pieces) was dropped by the bin men in the background. I don't blame them - it would destroy their backs to pick it all up. Perhaps they should try to not drop so much litter in the first place...  These photos were taken on the 1st March - a Saturday. The street cleaner, who does an excellent job around Underhill Road and Melford Road, bags up the rubbish and leaves them on a Thursday generally. They are supposed to be collected the same day or the next day at the latest. They weren't collected. The first photo was November. It was a very large number of poo bags. I reported it to Southwark but they took 3 days to collect it. In the meantime the bags were squashed and the faeces was spread everywhere, photo 2. It would mean that everyone who walked along that bit of road will have spread it a bit further, along with the vehicles, so that it went into a lot of people's houses.  Over to you Sue. In this photo you can see the litter that was dropped by the bin men (I feel bad as they are really nice and work really hard often going into people's properties to get the bins that weren't put out - usually at a semi-jog speed; it must be exhausting and its not their fault that Southwark doesn't give them enough time to do their job properly. Maybe they should sack their team of EDF astro-turfers to save some money?), the split blue bag with some birds sorting the contents on the pavement, and the refuse truck in the background. I don't blame the workers, I blame Southwark. I am also annoyed at you, Sue, for saying this is an exaggeration and is basically a lie; something you do all over the forum (along with the cycling trolls). I have a lot more pictures too.
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...