Jump to content

Recommended Posts

I think it works fairly well to avoid the bad stretch of Lyndhurst way by turning up into Lyndhurst Grove and then take a right onto Vestry road to either rejoin peckham road of cut through to Southampton road. It is basically up and down a hill though - but safer turning and a road with even surface which just about makes up for the extra effort needed...

If heading towards Camberwell, cut up through Warwick Gdns rather than Lyndhurst Way. It's nice to see the changing seasons and greenery first thing.


And you can keep to the back streets until Camberwell Grove taking you down to the Green and avoiding major traffic.

  • 2 weeks later...
Yes it is like a tramline. Really noticed it today while going down to Peckham rd. The other way to avoid Lyndhurst way is to break the law and cycle down the one way sections of Bellenden rd., which I am loathe to do, despite the excellent road surface.
  • 3 weeks later...

vandam Wrote:

-------------------------------------------------------

> St Norbert Road in Brockley is an absolute

> shocker- cracks and holes all over the place, if

> you ride it at night even with a decent light on

> you just have no chance of knowing what heavy

> bumps you might hit !! It is way overdue a bit of

> re-surfacing.


Looks like they have started doing some re-surfacing on St Norbert Rd, Yippee!

hopefully they will do the entire length of it down to Brockley station.

  • 1 month later...
I spotted heavy machinery and 'no parking' cones on Lyndhurst Way today. Could it be the March unused budget is going to be applied there? Unfortunately only half the road seemed to be designated. Why do they always leave unresurfaced bits when they improve a road eg Southampton Way, Peckham Rye.

edteacher Wrote:

-------------------------------------------------------

> I spotted heavy machinery and 'no parking' cones

> on Lyndhurst Way today. Could it be the March

> unused budget is going to be applied there?

> Unfortunately only half the road seemed to be

> designated. Why do they always leave unresurfaced

> bits when they improve a road eg Southampton Way,

> Peckham Rye.


Why do they open up a road, fill it in and days later another contractor digs it all up again to do something else.


Piss up in a brewery comes to mind.

Well, I was trying not to be too sceptical, was hoping they'd resurface the whole of Lyndhurst way and were just doing it in bits, but I wrote to the council and got the following response:


"Thank you for your enquiry regarding Lyndhurst way carriageway resurfacing road works. However Lyndhurst way will be resurfaced in two sections namely: from its junction with Chadwick Road to Holy grove Road and Lyndhurst way junction with Lyndhurst Grove to Lyndhurst way junction with High shore Road."


I've asked if there are any plans to resurface the whole thing. It's better than it was now, but still really bad at the top by the school.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • Trees are great - I plant and raise my own and petition the council to look at damaged specimens and plant more - but they need to be tended to when they’re in non-woodland spaces. I encourage all those who have a strong liking for trees to plant them, grow from seed etc. - much better for all than tapping on keypads. 
    • Would they keep until Christmas?
    • As a customer of DKH I have sympathy with the staff but this a matter for their trade union to address. The law states that temperatures in the workplace must be “reasonable”, and adds guidance that a reasonable minimum temperature is 16C for sitting down jobs like checkouts or 13C for physical work like packing and stacking.  The law also states that there must be easily readable thermometers installed in the workplace so that staff can check the temperature. When I still worked, these would be mercury thermometers red-lined at 16C, so staff knew when it was permissible to stop work if they were uncomfortable. However, I always worked in trade union represented jobs. I suspect (but certainly don’t know) that a lot of Sainsbury’s staff these days don’t bother to join the union, so are not protected (please put me right if you know otherwise).  In any workplace, you either take collective action to improve things or just accept the conditions imposed on you. If staff are in a union, they need to take a hand in making sure the union and its reps do their job in representing them.
    • £1,155 now raised. Would be great to get to £1,500 by 17th January when the Crowdfunder will close. His family and friends are hoping to do something for charity in his name... 
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...