Jump to content

Plantation shutters for sale


rich_thomas

Recommended Posts

I've got three sets of plantation shutters for sale.


Originally from DIY shutters, they're in great condition.


We've had new sash windows installed and the shutters no longer fit.


Looking for £50 p shutter - details below.


Will do my best to upload some pictures.







Shutter One -

Range:Painted Shutters

Shutter style:Cafe style

Width: 804 mm

Height: 800 mm

Panel order: RR

Slat size: 64 mm

Tilt rod: Central

Shutter colour: Signal White

Hinge colour: White

Frame sides: Left Right Bottom

Frame type: Plain L 60mm


Shutter Two -

Range: Painted Shutters

Shutter style Cafe style

Width: 800 mm

Height: 800 mm

Panel order: LL

Slat size: 64 mm

Tilt rod: Central

Shutter colour: Signal White

Hinge colour: White

Frame sides: Left Right Bottom

Frame type: Plain L 60mm


Shutter three -

Range: Painted Shutters

Shutter style:Cafe style

Width: 800 mm

Height: 800 mm

Panel order: RR

Slat size: 64 mm

Tilt rod: Central

Shutter colour: Signal White

Hinge colour: White

Frame sides: Left Right Bottom

Frame type: Plain L 60mm

Link to comment
https://www.eastdulwichforum.co.uk/topic/317556-plantation-shutters-for-sale/
Share on other sites

Archived

This topic is now archived and is closed to further replies.

  • Latest Discussions

    • Not sure if this is relevant, depending on the cause of the cracks, but I read recently that scientists have now invented a self-healing road surface, such that cracks and potholes will no longer appear (assuming I understood it correctly!). Don't know how long it will take before it comes into use, though.
    • Yep, the bit of road around the junction of Lordship Lane and Heber fails and is redone every few months. They've just finished the latest repairs a week or two ago and you can already see the cracks appearing. It'll be getting dug up again in a month or two.
    • To be fair, the holes had mostly been filled yesterday and it looks as though they will be resurfacing today. It’s less than 2 years since there were repairs at the same place, hopefully this time it will last longer!  
    • The message on the barrier says:” to be completed by 03/02/25 ! There are no workers there at all! I pass this section of the road on daily basis! Just the barriers and the hole 🕳️ in the road! It’s a joke and not even funny at all! 
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...