Jump to content

Pioneer PDP-506XDE 50" 720p HD Plasma AV package for £200 ono


mikemindel

Recommended Posts

This is a Pioneer plasma display system including TV, amplifier, various players, however no speakers.


* Pioneer Plasma TV (PIO-PDP506XDE) with plasma media receiver (PDP-R06XE).

* Denon Amplifier (DEN-AVR3806 ).

* Lcd/Plasma Bracket (TECH-TWM3).

* Pronto Rf Base (PHI-SBCLI900 ).

* Plasma Swivel Mount (FUTU-SWIVEL).

* Pronto Colour Remote (PHI-SBCRU990).

* Sony VHS player (SLV-SE700).

* Pioneer DVD player (DVD-350).

* Panasonic Blu-ray player (DMP-BDT310).

* WD TV Live Plus HD Media Player (1080P) with HDMI.


Comes with all the cables, fresh batteries, manuals, however no original boxes. There is also a floor stand and also wall brackets if you want to attach to a wall. All tested and in good condition 06.11.22.


Also some additional Hong Kong/Japanese DVDs and an HD media player with HDMI output.


IMPORTANT: Sold as is. There are no warranties and returns will not be accepted.

6.thumb.jpeg.5196ec9fe070c92d9fdec029447a6491.jpeg

5.jpeg.07bd140c5b8bfc7d2b149b31ec25ac4c.jpeg

4.jpeg.3e93553807fbe8be49bd032823ab5980.jpeg

3.thumb.jpeg.222e96ce27af72379d21bbea52fc8422.jpeg

2.jpeg.126ac5a5323729e7d0624c64ef31ca64.jpeg

1.jpeg.669c1fdeb84e73aa6ec6be24d2aea2b1.jpeg

Archived

This topic is now archived and is closed to further replies.

  • Latest Discussions

    • Not sure if this is relevant, depending on the cause of the cracks, but I read recently that scientists have now invented a self-healing road surface, such that cracks and potholes will no longer appear (assuming I understood it correctly!). Don't know how long it will take before it comes into use, though.
    • Yep, the bit of road around the junction of Lordship Lane and Heber fails and is redone every few months. They've just finished the latest repairs a week or two ago and you can already see the cracks appearing. It'll be getting dug up again in a month or two.
    • To be fair, the holes had mostly been filled yesterday and it looks as though they will be resurfacing today. It’s less than 2 years since there were repairs at the same place, hopefully this time it will last longer!  
    • The message on the barrier says:” to be completed by 03/02/25 ! There are no workers there at all! I pass this section of the road on daily basis! Just the barriers and the hole 🕳️ in the road! It’s a joke and not even funny at all! 
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...