Jump to content

child's bed ? 20


Recommended Posts

Child's bed: IKEA Leksvik. Solid wood, extendable, with mattress.


3 separate length positions to accommodate growth of child: perfect for ages 2-14.


Solid wood, condition is used, but in good condition. Can be collected assembled (in 2 parts) or I can disassemble for flat pack collection.


The mattress comes in three parts for the different bed lengths. Main mattress is coil sprung and the extension pieces are foam.


Main mattress has some marking compatible with normal wear and tear.


Solid, comfortable, well made and adaptable - another great piece of IKEA design.


Dimensions:


Minimum length: 138 cm

Max length: 208 cm

Height of headboard: 79 cm

Width: 90 cm

Mattress length: 138/169/200 cm

Mattress width: 80 cm

Mattress thickness 12cm

Link to comment
https://www.eastdulwichforum.co.uk/topic/295889-childs-bed-20/
Share on other sites

Archived

This topic is now archived and is closed to further replies.

  • Latest Discussions

    • Yes it could be a massive improvement and useful to hear that contracts have finally been awarded. I totally understand though why doubts are expressed about when the new square will open. This 2012 BBC article about mayoral funding after the London 2011 riots says "In Southwark, which saw parts of Peckham hit by the rioters, there are plans to redevelop Peckham Rye station". https://www.bbc.co.uk/news/uk-england-london-19167948 A decade later, the first phase on Blenheim Grove - the white buildings with the new roof deck - was kind of completed by summer 2022. Yet three years on those buildings are still covered with hoardings, gathering ever more graffiti. There has been no clear or coherent explanation from Southwark why, just some excuses of water ingress. How much rent must have been lost in that time and who has taken the resultant financial hit? In that context is it unreasonable to doubt that the new square will be fully opened next year - rather we'll get a fenced in walkway leading through an 80% completed square that we're forced to squeeze through for years to come? Dare I also remind people that the reality of what was built on Blenheim Grove didn't look as good as the renders. With construction inflation recently so high, it's valid to ask how the resultant funding gap for the main phases of this scheme will be bridged. It's not just Southwark's inability to manage major projects that are a concern but also its senior leadership's reluctance to be transparent about problems let alone make any visible efforts to tackle them.
    • Camberwell Old Cemetery weren't this morning, oddly out with strimmers near the meadow area;,but.... It's generally a haven for wildlife so can be forgiven 😊
    • "im good with .....". Good as an adjective not adverb
    • My recollection is initially it was a corner of the pub rather than a room. 
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...