Jump to content

Building firm wanted for rainy day project


Recommended Posts

This is a small job. I need a structural wall removed in my East Dulwich house. It?s a simple job, with nibs either side, steel required and perhaps slight strengthening of nib foundations. We have plans from a structural engineer that need adhered to and building control to comply with. I can be flexible within reason as to when the work is carried out. I?m expecting quotes around ?2k. If this sounds like you, get in touch with referrals.
  • 7 months later...

Hello,


Yes we did get it done. Unfortunately I can?t recommend my builder as they were actually a friends builder from far away that they convinced to come to London for us. It was ?2k all in and took 3 days. We were quoted 8k and 4K locally which really is a hiked up price. The process with the council was easy. You just contact them, they pop round and sign it off before plaster goes on and that?s it. Good luck. It?s messy so lots of sheets up.

  • 2 weeks later...

Archived

This topic is now archived and is closed to further replies.

  • Latest Discussions

    • A sharps disposal container has been left outside  our house near goose green.   If you or a friend is missing one PM me for exact address. Presumably a contractor collects a full on and delivers replacements.  Better than a keysafe you didnt order!!
    • I would like to recommend Robert Mills, he came to sort out our central heating last week.  He is punctual, clear about what needs doing and gets on with it very efficiently.  His contact details are 07952 584171.  Thanks for giving us back a warm house Robert! 
    • Thank you everyone.  Let's hope they all get cleared sometime soon. 
    • Thanks for posting this. It looks as though the proposed footprint of the event is larger than ever before, with fenced off trackway stretching down the Colyton road side, well beyond the metal fence perimeter. The schedule is now set to take up most of May and the first week of June, again one of the most beautiful times of year in the park. They are wanting to add another day, which this year will be a supported 'community' festival. But surely this is to set precedent for adding many more days in future? Be careful what you wish for; the park is up for hire by this council. Do we want it to go the same way as Brockwell, where local residents are in despair at the slow erosion of their park and the annual noise and disruption? Protecting our green, tranquil natural spaces is vital for the lungs of the city, for wildlife and the mental health of our local population.    
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...