Jump to content

3-7yrs Toys/Duplo/Games/Books/Doorbell House/Puzzles/Knex


Tams

Recommended Posts

Soft back, used: one third their r.r.p.

Soft back unused: half their r.r.p.

Hard backs: half their r.r.p.


(Pirate Pat, Magic Ring and Captain MAC are all early readers)

(Ravenous Beasts is a used soft back with a CD).

(Planes is an unused hard back)

  • 3 months later...

Games used but in very good complete condition


GONE: Orchard Toys Dinosaur Race ?7

GONE: Orchard Toys Traffic Jam ?4

GONE Tre-ominous ?4


Playtime Hoopla (wooden) ?4


GONE Brain box ABC memory game ?5

GONE Brain box numbers memory game ?5 (not in photo)


Djeco Magnetic?s Fishing Lily, wooden ?6


Near Heber School

  • 3 weeks later...
  • 1 month later...

GONE Buzz Light year with 5 voice commands, Laser sound & light, and jet booster release.

I think it is an early one, Mattel pre 2013, approx 11 inches tall.

Good, working condition ?10.

The wings are in a fixed position but made of strong flexible plastic.


AVAILABLE:

Buzz Lightyear utility belt for dressing up.

4 attachments including a shooter with 5 ?darts? and a ?lazer? That requires batteries.

Thinkway toys. Currently retailing on EBay for ?34 (!)

Very good working condition, ?12


GONE Toy Story 3 book & CD, good condition ?3.

  • 4 months later...
  • 5 weeks later...

Archived

This topic is now archived and is closed to further replies.

  • Latest Discussions

    • Yep, the bit of road around the junction of Lordship Lane and Heber fails and is redone every few months. They've just finished the latest repairs a week or two ago and you can already see the cracks appearing. It'll be getting dug up again in a month or two.
    • To be fair, the holes had mostly been filled yesterday and it looks as though they will be resurfacing today. It’s less than 2 years since there were repairs at the same place, hopefully this time it will last longer!  
    • The message on the barrier says:” to be completed by 03/02/25 ! There are no workers there at all! I pass this section of the road on daily basis! Just the barriers and the hole 🕳️ in the road! It’s a joke and not even funny at all! 
    • The problem is that Thames does replace whole sections of pipe, for instance outside the Horniman, which took several months, but which fails about every 18 months needing more repairs. They replaced sections around Underhill which failed almost immediately and the original work and repairs also took out the gas supply! Their work quality is incredibly shoddy, and they don't care. And their regulator is a joke. They are the worst sort of grasping monopolists, owned by overseas capitalists with no moral investment or relationship with the country in which they operate. Without a tough regulator with real powers and teeth they are uncontrolled foxes in our hencoop. Privatisation can work, look at Telecoms, but this absolutely hasn't. 
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...