The spur track south of Peckham (visible on trains from ED station going into London Bridge) seems to be well on the way to completion. I wonder if the work at Denmark Hill would stop the line itself being completed?


The Overground line could start running and just not stop at Denmark Hill until work there is complete. We could start to see ghost Overground trains using the new route to bed in.


It would also not surpise me if an early limited service was started in time for the Olympics - a nice bit of PR for the Overground and for Boris.

TfL have told us (SRUG, Southwark Rail Users' Group) that the plan is to end the South London Line on 8th December and start the East London Line on the 9th December 2012. Indications are that all is on time.


From that point we will have the extra 4tph between Clapham Junction and Canada Water (Jubilee connection), but lose 2tph to London Bridge and Victoria. This will reduce the London Bridge trains to 4tph from Peckham Rye, and cut all trains to Victoria in the evenings and Sundays.


The campaign to get those Victoria gaps filled is still continuing and though the signs aren't good in that we haven't lost hope that something can be done. see here for the latest on that campaign.


If we lose the battle this year for that timetable, we will be campaigning hard to get the full 7 days a week service to and from Victoria into the rail franchise to be renewed in 2014.


These campaigns to be successful depend on a lot of informed users making their views known at the right time. So please join the email list ? email: SRUG@southwarkrailusers.net

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • I’m not sure home delivery will replace physical supermarkets. I got the impression that they’re generally loss- making for the retailers and they’d much prefer to encourage customers back to the shops. I read somewhere that the typical Ocado order was around £100 but costs Ocado £120 to fulfill. It works for M&S because they have roped Ocado into a contract where Ocado carry the bulk of the loss.
    • Ocado stopped sourcing from Waitrose a few years ago. They now source from M&S and general brands. Waitrose have their own delivery service now. I don't know how well served SE22 is by it. Ocado offers for new customers are, or certainly were, really good, particularly in the run up to Christmas. I think I got 20%/15%/10% up to a maximum of £100 spend off my first three deliveries with no delivery charge or commitment to sign up for further deliveries. There wasn't a time limit, IIRC, so it was a great way of restocking heavy store cupboard basics and stuff for the freezer.
    • Fair enough point, but does that not in a way make it even worse if they open a shop almost directly  opposite another "family" business selling exactly the same type of products?
    • As Occado source from Waitrose, and were their only deliverer at one stage, and as Waitrose do now deliver it may be they feel their reach in ED is sufficient to mean having a local outlet would not gain them sufficient additional sales to be cost effective. The movement to delivery rather than physical shopping during Covid has I believe substantially changed the grocery economics. So it may be that the High Street dynamic for physical shops has now changed. 
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...