Jump to content

Recommended Posts

I see work has started on what I have been told is a New Crossing.


This is sited by the Bishop Pub at the Junction Lordship Lane / East Dulwich Road.

There is a Box Junction there with traffic / Buses turning.


Because of this and the Busstop after the Box Junction and the Roundabout, traffic is

virtualy permantly backed up there.


This would mean that if there is a crossing there, traffic would tend to back up over the crossing.


Or ? when the lights of the crossing were green for traffic to proceed, there will be no where for

the traffic to go.


Another Brilliant Southwark Council Design feature.


No doubt they will install a Camera to catch drivers who get stuck across the Crossing when the lights turn Red.


Fox.

Link to comment
https://www.eastdulwichforum.co.uk/topic/21424-new-crossing-lordship-lane/
Share on other sites

In fairness, people have been asking for a crossing on LL for years - and the plans were publicised on here by James Barber some time ago. Crossing ED Road there is a bit of a lottery, with buses coming from all directions and cars accelerating hard from LL to slip through a small gap in oncoming traffic. Personally, I'm happy with anything that makes LL more pedestrian friendly.

My wife mentioned the problems with the traffic yesterday and that it took 20 minutes on the bus to travel one stop towards Goose Green because of the roadworks. Someone needs to get the council to move the bus stop by the works to a temporary location and create a no-parking zone near the works to prevent the bottle-neck that seems to be being created during the day. My wife tried calling the Highways Office yesterday but just got passed around their office with no one wanting to take responsibility.


If James Barber (or any other local councillor) is reading this then grateful if they can have a sensible word with Southwark.

lpool Wrote:

-------------------------------------------------------

> My wife mentioned the problems with the traffic

> yesterday and that it took 20 minutes on the bus

> to travel one stop towards Goose Green because of

> the roadworks. Someone needs to get the council

> to move the bus stop by the works to a temporary

> location and create a no-parking zone near the

> works to prevent the bottle-neck that seems to be

> being created during the day. My wife tried

> calling the Highways Office yesterday but just got

> passed around their office with no one wanting to

> take responsibility.

>

> If James Barber (or any other local councillor) is

> reading this then grateful if they can have a

> sensible word with Southwark.


Better get used to it! It seems that it will take up to 3 months before it is finished. Then there will be another crossing up by the co-op. 1 crossing is fine and needed, 2 is just daft. But I guess that is Lib Dem for you.

Eddie said

Better get used to it! It seems that it will take up to 3 months before it is finished. Then there will be another crossing up by the co-op. 1 crossing is fine and needed, 2 is just daft. But I guess that is Lib Dem for you.


Eddie, Southwark has been run by LABOUR since 2010.

At last - There is now a crossing at every Major Road between me and Springers Wine Bar. I can now get there safely and more importantly walk home safely after 1 glass of wine. Trouble is Springers (Wine bar) is closed and a Trendy Meat Shop has replaced it. When will they stop closing trendy wine bars. ?

DulwichFox Wrote:

-------------------------------------------------------

> The New Crossing should be by the Co-Op. Where

> there are no road junctions

> That is where most people Cross the road. (Jay

> Walk.)

>

> Putting the crossing by the Bishop will mean

> People will still try and cross by the Co-Op.

>


xxxxx


Maybe, but it will still make it a lot easier to cross the road opposite the Bishop without taking your life in your hands each time :)

Hi DulwichFox,

I think your fears are unfounded. I've seen an itemised report of issued tickets by category and I don't recall seeing any tickets numbers for that type of issue.

We will have two crossings - one outside the Coop which is clearly them ost obvious required one. The second from The Bishop is partly ot help cross Lordship Lane but partly to put breaks inthe traffic allowing vehicles in and out of East Dulwich Grove and to make EDG crossing easier for pedestrians. Long story but the original proposal to have traffic lights at that junction would have meant much less parking which ED cllrs couldn't support to the degree required versus the 'benefits'. I proposed a zebra crossing to break up the flow. After several years council officers/contractors came up with a Puffin crossing and agreed probably the only way to achieve the aim without signalising the junction etc. Feel free to call me for fuller explanation.


Hi eddie,

I think the two will work well and actually are intended to achieve different things. See above also feel free to call me about them.


Hi Ipool,

I'll ask officers abotu your suggestion. Thank you.


Hi TownleyGreen,

Yes Labour have led the council since May 2010 but these crossings were started some years ago. I doubt Labour would have wanted to stop these crossings. Also a lot of background with officers leaving the council and compliants by ED cllrs upheld etc. Very sad its taken so long to happen but we're getting there.


The Artfull Dogger. Haha. I needed that on a cold Monday morning.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • Another recommendation for Dulwich Test and Services Centre. Only been using them for a couple of years but wish I’d found them earlier 
    • A new roadmap (surely railmap?!) for rail accessibility has been published: https://www.gov.uk/government/publications/accessible-railways-roadmap It says "approximately 56% of stations and around 66% of the 1.3 billion journeys that take place on the network have step-free access to platforms...  "£373 million has been committed over the next 5 years to deliver Access for All projects, providing step-free access from station entrances to and between platforms, alongside other essential accessibility upgrades. These works, together, will increase the number of step-free stations across Great Britain from 56% to 58%. "This improvement will make travel easier with step-free access available at stations covering an increased share of total rail journeys – from 66% up to 71%" Don't know what that means for us here: upgrading Peckham Rye would cover a lot of rail journeys but the cost has no doubt increased from the £40m figure previously quoted. So that would eat into a lot of the funding.
    • It's not really though, is it. It's practical.  At least we're allowed Christmas lights.
    • We are the only specialist floor insulation company on the market to focus on insulating from below – meaning almost zero mess, disruption or noise! Warmdwell is extremely proud to receive the highest reviews for our professionalism, reliability, commitment and the all-round ease of doing business with us: we draw our team from professional, creative, educated backgrounds to provide a friendly, problem-solving team with the deepest integrity. We take real care of your home and aim to leave it as spotless as possible. Please check our Google Reviews to speak for us: "We were really pleased with their quote, communication, and with having the job done perfectly with almost zero disruption. We think they left the space cleaner than when they arrived, and we are definitely already getting the effects of a warmer room" – Miriam & Abed, Sevenoaks, Oct 2025 "Laurence and his team were extremely polite & helpful, and the work was performed over just 2 days with minimal disruption. It was absolutely the most relaxed work I have ever had performed on the house!" – Alistair, Cambridge, July 2025 "Extremely friendly, polite and efficient" – Diane, Forest Hill, June 2025 We are always keen to chat through your floor insulation options and provide as much free advice as we can, as well as free quotes and surveys – so why not ask us today about what is possible to protect your floors from the cold ventilation air blowing underneath, keep your heat in and warm up your home? We use high-performance mineral wool slabs, never foam, for so many reasons: it is the ideal flexible material for the irregularities of old floors; is breathable, working with the way your floor has successfully performed for perhaps 100 years or more; can easily be removed to access pipes and cables; and is completely non-combustible. A local business based in Crystal Palace, we work extensively around Dulwich, Herne Hill, Forest Hill, Lewisham, Tooting, Balham and across the south East of England. Please ask us about your floor insulation options or for local project case studies today! Phone Number: 02080792793 Email Address: [email protected] Website: https://warmdwell.co.uk/ View full listing
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...