The ongoing road works to the above have brought a welcome rest from the inteminable noise of the passing buses, however I'm a little confused about what work is being done. They dug up to a depth of about 2 foot the top of Cheltenham road and have relaid. They've ignored other sections, and only scrapped the surface off the bottom section.. What is really worrying is the start of Ivydale the've dug up again about 2 feet, but left the middle (and most damaged section) alone, it now seems they're filling it in to resurface. Since the middle of the road is in a contiuous state of collapse, is this just another example of Southwark doing a botch job on road repairs, or are they afraid that if the dig up the middle, it'll show the water/drains have collapsed?
Link to comment
https://www.eastdulwichforum.co.uk/topic/21339-cheltenhamivydale-road-works/
Share on other sites

  • 2 weeks later...

Hi Noonan,

myself and the other two Peckham Rye ward councillors had meetings with Southwark engineers and contractors on Friday. Cheltenham Rd is not finished, they are going back there to do more works. Apparently they did a survey and areas with damaged substructure are having deep reconstructure (not the whole road as we thought!). Once the initial works are completed, they will be inspected and a snagging list will be drawn up. Any remedial works are to be done at the contractors own cost. The works will come with a one year guarantee, so if you notice problems with what has been done, please let me know. Residents have been contacting us about the work and that's why we called for the meeting. We were told that the works are nowhere near completion and that we are jumping the gun with our concerns.


Renata

Thanks for the update, Renata.


"We were told that the works are nowhere near completion and that we are jumping the gun with our concerns."


Conversely, we were told that the works were due for completion by the end of Jan 2012, that's just 7 working days away. If the works are nowhere near completed, does this mean the road closure and consequent bus diversions are expected to stay in place into February (and beyond..)? Also, when the snagging takes place, will we be facing additional disruptions to the buses?

  • 2 weeks later...

I was visiting some friends on Ivydale yesterday.

I was amazed and shocked that so far 4 months on Cheltenham and Ivydale. With letters placed on windscreens about works taking place that didn't for weeks. Whole thing a fiasco.

If you live on these roads and feel you've been messed around the contract for highway maintenance is up for renewal.

Tell the councillor who's accountable [email protected] what you think of the current contractors FM Conway.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • Walking last Friday early evening anywhere near where the bottom end of Lordship Lane meets the Goose Green roundabout, one would have been directly confronted - as I was - with this scene: Outside the East Dulwich Tavern an impenetrable phalanx of pushing yobs, shouty louts and selfish yahoos pressed outward from the open doors of this establishment, past the curtilage (the land in front of and owned by the business), all across the public right of way, to the kerbside. This was the situation all the way along, end to end. I watched as passersby, old people, children, parents with buggies, people just going about their business, were forced by these booze-sucking bellowing scumbags onto the road - where, at that hour, traffic rushed endlessly off the roundabout. We have, I realised, somehow become so used to this revolting spectacles as to believe it to be inevitable. It is not. This is why I'm dropping this post. Enough really is enough. This roiling boozy blockade represents a total failure by all the responsible authorities - the licencing authority, for example - but most of all (yet once more, again, as ever), by Southwark Council. Two very different comparisons to give you some perspective: 1. The Kings Head pub on the corner of Albermarle and Stafford Streets, London SW1. Here too, patrons like to drink and chat outside on a warm evening - why should they not. But here, on the latter side a line marks the curtilage on the pavement. Drinkers remain, respectfully, in good order, within the line, watched, quietly and carefully, by a security guard. I wager good money this arrangement is a condition of this pub's licence. 2. The Blue Brick is a cafe in the quiet backstreets of East Dulwich, on the corners of Fellbrigg and Shawbury Roads. Until a few months ago, about half its covers were tables out on the pavement. They bothered nobody. Oh! But they extended all of several centimetres too far into the footpath, so into fearless action swang Southwark Council officers - and now these tables are gone. Result, eh? "Well you see," some wiseacre said to me, "There needs to be a complaint." Not actually true, but for sure this is all too often how local authorities get pushed to do what they should be doing. Hard to think why a complaint trumps, say (and god forbid!) a child being injured on the road. In which circumstance, of course!, Southwark would swing into noisy, virtue-signalling, belated action. But in any case let this post be considered a big, very definite COMPLAINT about this prolonged abuse of our public right of way. I invite readers who agree with me to add their voices. Oh, and all those wee local ward councillors might get off their chufties, defy their party managers, and actually help sort this scandal out. Thanks for reading, Lee Scoresby
    • Hi there, I saw that Google lists the park opening time as 7:30am, but I was wondering if it might actually open earlier than that - maybe anyone who’s out running early or passing by has noticed?  
    • We are thrilled to announce that Little Stars Creche in Dulwich will be opening its doors on 28th April and we would love to invite you and your little ones to an open day where you can meet our team and visit our wonderful setting.  Little Stars is a fun creative space for children aged 2 to 4 years to enjoy whilst parents and carers get some well needed time to catch up on life! We are so excited to bring this much-needed service to the community, and we want to thank all the wonderful parents and carers for participating in our recent survey. Your feedback was invaluable in shaping Little Stars and ensuring it meets the needs of local families. For full information about Little Stars and a detailed schedule please visit our webpage here: Little Stars Crèche We can’t wait to meet you and your little stars soon!
    • Avoid any 2nd hand vehicle with the Ford petrol 1.0 Ecoboost engine and the Petrol 1.2 PureTech engine that can be found in Peugeot, Citroen, Vauxhall.... (you need to mention price for advice)
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...