Has anyone else noticed a complete lack of ANY work being done at Denmark Hill train station? I haven't seen a single workman there in the three months the scaffolding and temporary bridge went up. I'm half wondering if they've just run out of money for the project.

Oh, hang on, they have managed to cut some trees down. Wow.

teddyt Wrote:

-------------------------------------------------------

>I haven't seen a single workman there in the three

> months the scaffolding and temporary bridge went

> up.


I'm guessing you've been looking in the day time. Due to the proximity with a live track I would have expected most works to be done at night when there are no trains.

PSJ Wrote:

-------------------------------------------------------

> I was thinking the same, but when passing their

> today they were working at laying the path from

> the main road to the platform.

Safety rules won't prevent all work from being done during the day, only those things that carry a risk of falling onto the track, materials slippage, machines that could slew across the track or into any live equipment etc. That often means that no work is done during the day but laying a path sounds like something that could be done with no inherent risk.

If you look carefully you'll seem some huge polysytrene blocks. These are used to fill in the gaps between platforms when they're working on site enabling workers to easilly get around and move materials and equipment. To use these blocks they must be getting line closures. So I suspect most work it planned to take place at night time or weekends with train line closures. They plan to now finish summer 2012. I suspect before 1 July when the Olympic madness really cuts in. So I don't get any idea of a great rush and wouldn't expect more than one shift working on site doing nights. Which means most of us wont see much happening until new foundations in place and then above ground visible works.
  • 2 months later...

Still not a lot of movement 7 blokes standing around the one hole since christmas.

I am wondering if the have turned the polysytrene block into polysytrene tea cups as they always seem to be drinking tea.


Also this only seems to take place between the hours of 09.00 - 1400 then all you see is dust fron their vans leaving site.

  • 6 months later...
Does anyone have idea what is going on at Denmark Hill Station? They closed the main station entrance for months and erected a tempory footbridge, now the station is open again but looks identical to before (albeit perhaps with a lick of paint). I thought they might have at least done something about the crazily narrow doorway which is a total bottleneck when busy in the mornings. I have seen drawings somewhere of a gleaming glass and steel footbridge with lifts included, but progress in constructing this seems unbelievably slow. Summer 2013 now looks more realistic.

postboy Wrote:

-------------------------------------------------------

> I'm waiting to see if the station will become

> accessible as my husband is disabled and has never

> ever been able to use that station, also applies

> to East Dulwich.



All of the publicity about the redevelopment is very clear that step-free access is one of the main things they are doing.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • Yes, Southwark Leisure sent an email (see below) to tell me that it’s was reopening on Christmas Eve but that had to be postponed due to the chlorine leak. They’ve been good keeping me updated by email. The website also gives details.    Get Ready – Dulwich Leisure Centre gym is about to open! Ho ho ho! Santa has delivered the ultimate gift of fitness just in time for Christmas. We are beyond excited to announce that the brand new gym at Dulwich Leisure Centre will be opening on 24 December! Please note the opening times on this day are 7am to 3pm. We know our Dulwich members have been eagerly awaiting this moment, and we deeply appreciate your patience and understanding. Trust us, it’s been worth the wait! You’re going to absolutely love the new facilities! £2m Gym Refurbishment across seven centres This marks the completion of our £2m refurbishment project across our centres. The feedback has been really positive overall, and it’s been fantastic to see so many of you exploring different centres. To ensure you get the most out of the new equipment, we’ll be hosting additional induction sessions and gym floor classes in the New Year. Let’s kick start your New Year’s resolutions together! Dulwich Update: Main gym complete: The downstairs gym is now complete with cutting-edge equipment, a fresh, modern design, and more functional space. Inspiring BOX12 circuit coming soon: We’re taking your fitness up a level with our brand new BOX12 circuit on the balcony opening in the New Year. If you’ve experienced the BOX12 studio in Camberwell, you know what’s coming. If not, prepare to be inspired by this innovative training! Book Your New Gym Induction: We’re hosting sessions to help you get comfortable with the new equipment and understand how to best use it to help you reach your fitness goals. Book now on the Southwark Leisure App or website. Thank you Thank you once again for your patience while we’ve been working to complete the gym refurbishments. We can’t wait for you to step inside, beat the January rush, and start your new year fitness journey with a bang! Best Regards,   Phillippa Gillespie General Manager Dulwich Leisure Centre Southwark Leisure.
    • Key found Dec 24th on Bassano Street. Please send a message with a description if you think it is yours.   
    • Merry Christmas and Happy New Year to everyone.  Wish you all the best for 2025. Thank you for your support.  At this time of year much clearance and cut back is needed for good growth in the spring. Fruit trees could benefit from pruning while in dormant.  Saied
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...