Jump to content

Someone to dig out, fill with harcore base and gravel driveway


JMB2012

Recommended Posts

Hi - I need someone to dig out to 100mm my dirt driveway (no concrete to remove or anything, currently just dirt covered in weed supressing membrane). Backfill with hardcore base and top with gravel. Maybe honeycomb matting as well, I'm not sure it needs it - will take advice. Small retaining wall of 1 brick has been put in place on concrete footing but needs setting in place / brick laying - this is to keep flower beds free from gravel and won't be driven over by cars etc.


Please let me know if you'd like to quote. We'd like it done soonish.


Thanks.

Good morning. We are very interested in giving you a free quotation for the works you require. We are a roofing and property maintenance company.

Please give us a call on our direct line 07587544261.

Many thanks

Francis

Keyline

Archived

This topic is now archived and is closed to further replies.

  • Latest Discussions

    • I am sorry to  continue this, but I found your previous  comment about me very personal,  disturbing and upsetting, which was why I responded at length. I'm sorry it bored you. I try to stick to facts. I have investigated. You (and anyone else) can go into the "search" settings on here and  do a search on an author's name. So you can (I presume) find all my posts, including any which were  replying  to you. I can't imagine that they are in greater numbers than my replies to anyone else, but you can see for yourself. I guess you can probably also find examples of what you call my "usual sarcasm". I wasn't aware that l had a tendency to sarcasm, though I do find a lot of things funny.  There is no need to reply to this unless you actually find evidence in support of what you said. Sorry everybody else. I had to get it off my chest as I was lying awake last night worrying about it 😭
    • Roy Ayers RIP   https://www.theguardian.com/music/2025/mar/06/roy-ayers-jazz-funk-pioneer-everybody-loves-the-sunshine-dies
    • The Section 20 is just notification of intention to carry out works.  You have the right to object, propose an alternative or find different contractors. If you are joint freeholders why is your co freeholder acting unilaterally?  What is your usual mechanism for making decisions?
    • Hello, Does anyone have any other recommendations? Thank you
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...