I am appalled and shocked that there is to be no exit onto Windsor Walk (based on what I'm garnering from this thread and a cursory check on the designs), especially as several sections of wall have been knocked through on this side over the extensive period of works. While it may only shave a (often crucial) minute or three off my and others' arrival onto the platform, it beggars belief that it was not considered as a curative measure for the heavy flow in and out of the main exit. It's not too late for this to be considered, surely? It's a no-brainer, with the newly constructed walkways centimetres away from this permieter wall. Can anyone advise/petition? I also echo sentiments on project over-run and cost of works.